View on GitHub

Springboro Ordinances

Codified Ordinances of Springboro, Ohio

Download this project as a .zip file Download this project as a tar.gz file

1272.12 EROSION AND SEDIMENTATION CONTROL.

Effective erosion and sedimentation controls shall be planned and applied according to the following principles:

​(a) The smallest practical area of land should be exposed at any one time during development.

​(b) When land is exposed during development, the exposure should be kept to the shortest practical period of time.

​(c) Temporary vegetation and/or mulching shall be used to protect critical areas exposed during development.

​(d) Sediment basins (debris basins or silt traps) shall be installed and maintained to remove sediment from run-off waters from land undergoing development.

​(e) Provisions shall be made to accommodate the increased run-off caused by changed soil and surface conditions during and after development.

​(f) Permanent final vegetation and structures shall be installed as soon as practical in the development.

​(g) The development shall be fitted to the topography and soils so as to create the least erosion potential.

​(h) Wherever feasible, natural vegetation should be retained and protected. Development of the PUD must conform to the municipal tree ordinance.

(Ord. 02-4. Passed 1-17-02.)